Friday, December 19, 2008

Demolition/Framing (MMR 10)

We can't seem to find all of our pictures (whoops) of the bathroom demolition, which chronicle the delicate task of removing the powder pink and baby blue tiles, so until we can dig them up, I'll just give you a peak at what the area looks like after we've done some new framing and are removing a wall from the master bedroom to expose our work.


You can see the void where the old bathroom and master closet where through the old master closet doorway. To the right is going to be the new entrance to the master bathroom.














Here we've removed the part of the wall that is now the entryway to the master bathroom and master closet, and framed in the wall where the old master closet doorway was.















After careful consideration of how beat up the old plaster wall was, and the fact that I was going to basically have to skim coat the whole thing with spackle, I decided the fastest and easiest solution would be to remove the rest of the plaster wall and just install some new drywall.